Road Project Survey & Design :

Road Project :

  • (i) Map study (Provisional alignment Identification).
  • (ii) Reconnaissance survey.
  • (iii) Preliminary survey.
  • (iv) Final location and detailed surveys.
  • (v) Earthwork calculations and drainage details are to be work out from the level books
  • (vi) Cross sectional levels are taken at intervals of 50-100min Plane terrain, 50-75min Rolling terrain, 50 min built –up area, 20 min Hill terrain

Drawaing & Report :

  • (i) Key map
  • (ii) Index map
  • (iii) Preliminary survey plans
  • (iv) Detailed plan and longitudinal section
  • (v) Detailed cross section 6- Land acquisition plans
  • (vi) Drawings of cross drainage and other retaining structures
  • (vii) Drawings of road intersections
  • (viii) Land plans showing quarries etc.